Excavation permits checklist for BC projects

Before the first bucket goes in the ground, a BC excavation can touch a dozen different rules. This checklist links each one to its source.

Not every rule applies to every job. A residential lot in Surrey and a creek crossing in the Interior have very different lists. Use this as a starting checklist, then confirm each item with the authority that runs it.

Municipal permits

  • Building permit: in many municipalities excavation itself is construction that needs a permit. The Township of Langley’s Building Bylaw defines construction to include excavating and shoring, and the City of Langley requires a permit before work including excavation related to construction.
  • Soil deposit and removal permit: most Lower Mainland and Fraser Valley municipalities have one, with very different thresholds. See the soil and fill guide.
  • Tree permit and protection barriers: most cities protect trees from 20 cm diameter (Surrey from 30 cm). See the tree bylaw guide.
  • Erosion and sediment control permit: triggered by site size in most cities. See the ESC guide.
  • Road and right-of-way permits: for example Surrey’s City Road and Right-of-Way Use Permit and Delta’s Highway Use Permit for work in the road.
  • Streamside or environmental development permits: within 30 to 50 m of a watercourse, depending on the city.

Provincial and federal

Agricultural Land Reserve: placing fill or removing soil in the ALR needs an exemption, a Notice of Intent or an approved application from the Agricultural Land Commission.

Source: ALC: Soil or fill use

Soil relocation: moving soil off a site with a current or past industrial or commercial use listed in Schedule 2 of the Contaminated Sites Regulation can require a Soil Relocation Notification, submitted by a qualified professional at least one week before the move.

Source: BC Government: Soil relocation

Changes in and about a stream: the Water Sustainability Act requires a notification (at least 45 days before work for listed low-risk changes) or a change approval.

Source: BC Government: Notification of authorized changes

Fish and fish habitat: under the federal Fisheries Act, work that cannot avoid harm to fish may need a DFO review or authorization.

Source: DFO: Projects near water

Archaeology: sites with evidence of human habitation or use before 1846 are protected on public and private land, recorded or not.

Source: Heritage Conservation Act

Provincial highways: work on a provincial highway, its right-of-way or highway bridges needs a highway works permit from the Ministry of Transportation and Transit.

Source: BC Government: Highway works permits

Safety

Utility locates: before excavating or drilling with powered equipment, the location of all underground utilities must be accurately determined.

Source: OHS Regulation s.20.79 (King’s Printer)

BC 1 Call members ask for 3 working days’ notice of a locate request.

Source: BC 1 Call: FAQ

Notice of Project: WorkSafeBC must receive a notice at least 24 hours before work starts if, among other triggers, a worker may enter an excavation (other than a trench) over 1.2 m deep, or a trench over 30 m long.

Source: OHS Regulation s.20.2 (King’s Printer)

Checked October 2026 against the sources linked on this page. Rules change, so confirm with the authority before work starts. General information only, not engineering or legal advice.