PCE Ltd.Pacific Coast Excavating (604) 835-0066Call PCE
Roller compacting the new gravel driveway

Excavation in Pitt Meadows

Mostly farmland, with the North Lougheed Area Plan guiding new development. Pitt Meadows adopted a new soil bylaw in 2025.

About Pitt Meadows

Local rules that affect excavation

Checked October 2026. Each point below links to Pitt Meadows’s own bylaw or web page. Bylaws change, so confirm with Pitt Meadows before work starts. General information, not legal advice.

Soil deposit and removal

  • Soil Deposit and Removal Bylaw No. 3000, 2024: no deposit or removal without a permit, an exemption or ALR compliance. Permit applications include a Drainage, Erosion and Sediment Control Plan from a qualified professional. Source: Bylaw No. 3000 (PDF)

Tree protection

  • Interim Tree Management Bylaw No. 3035, 2026: cutting or damaging a tree of 20 cm DBH or more needs a Tree Management Permit (ALR trees are exempt). A tree management plan is required if permit trees are on or within 5 m of the site. Source: Bylaw No. 3035 (PDF)

Streams

Provincial and federal rules apply too

Municipal bylaws sit on top of provincial and federal rules: BC 1 Call locates and WorkSafeBC requirements on every dig, the Agricultural Land Commission for fill in the ALR, soil relocation notifications for some commercial and industrial sites, and the Water Sustainability Act and Fisheries Act near streams. Our Excavation permits checklist for BC projects links each one to its source.

PCE in Pitt Meadows

PCE is based in Langley and works across Langley and the Fraser Valley. Services we take on here:

Got a big job coming up?

Tell us where it is, what needs to come out of the ground and when. We’ll tell you how we would do it.